|
Post by vmrod on Jan 30, 2009 13:55:55 GMT -3
A couple pointers for this part. 1. It might be plausible to simply buy Granada spindles, and cutoff the area where the upper ball joint connects. (proper tapered holes are already there!) You would then weld this chunk as required to those side plates. 2. If you will fab FA-SM-23. Here is a link (thanks Cal) for a drill bit. www1.mscdirect.com/CGI/NNSRIT?PMAKA=04356135 Note: If you browse the net, you might find a coupon. (I got a $26 discount for this!!)
|
|
|
Post by vmrod on Feb 6, 2009 22:01:43 GMT -3
Drill a large pilot hole first. (mine was 31/64 or something like that).
Using a drill press, I slowly drilled the steel with the special bit. Takes some time and drilling wax (or oil), but it is not hard to do. The drill bit still seems very sharp and ready to drill the next one when time is available.
|
|